Latest GK GS

Updated By: LatestGKGS Desk

India aims to rise 100 GW solar energy rooftop capacity by 2020

 

 

India rooftop market solar enegy installed 1 GW energy at a fastest pace this year with aim to rise 100 GW by 2020

India’s rooftop market has added a new installed capacity of 1 gigawatt (GW) totally.

The companies offering rooftop solar projects are Clean Max Solar, Amplus Solar, Cleantech Solar Azure Power, Rays Power Experts and Hero Fund Energies.

From past 1 year India has added 513 MW of rooftop capacity which is the fastest pace this year.

India aims at 100 GW by the year 2020

The solar rooftop aims at installing 12.7 GW of capacity by 2021 and targets to cover 100 GW of total solar energy by 2022.

40 GW is expected to come from rooftop solar while 60GW is expected from grid connect solar projects.

From the last four years, the cost of roof solar has been fallen to 12% per annum.

There is greater cost competition between rooftop solar and grid solar projects which helps in its growth.

The main leading states which installed the total capacity is Tamil Nadu, Maharashtra and Gujarat.


 

Latest Solar Energy Updates

» Union government cancel mid-year review publish bill before Apr 1

» UIDAI Challenge drive for Aadhaar Card from 15 Oct to cover all

» Oil minister launch Seismic Programme for hydrocarbon in Odisha


Latest GK GS Updates: